Last updated:
You pressed the order button, and a minute later you read the confirmation and saw it: the wrong size, the old address, or two letters of your coffee corner’s name in the wrong order. It happens at every counter. This page explains how to cancel a Brew Tee order or change it, how long you have, what we need from you, and what your options are once that time has passed. The short answer is to email support@brewtee.shop within 24 hours of placing the order.
Cancelling and changing at a glance
- Window: within 24 hours of placing the order.
- How: by email to support@brewtee.shop, with your order number.
- What can change: the typed café name and its extra lines, size, colour, mug or poster size, quantity and delivery address.
- Cancelled orders: refunded to the original payment method.
- After 24 hours: still write to us. If the order can no longer be changed, any product can be returned within 60 days of delivery with a free return label.
- Refund after a return: within 7 days of receiving the return.
- Our reply: within 24 hours on business days.
1. Why the window is 24 hours
Nothing here is pulled from a shelf. Each piece is made to order by our print partner, and making takes 1–3 business days. That is quick, which is good for delivery and less good for second thoughts. Once the lettering is on the mug, it cannot be taken off again.
So the order rests for a short while first. For 24 hours after you place it, you can ask us to cancel it or change it, and we will. The window is counted from the moment you placed the order, which is the time on your order confirmation email.
We also do not email anything for your approval before printing. What you typed is what will be printed, with your spelling, capitals and punctuation. That makes the first day the one moment to step in, and it is why this page asks you to read your confirmation email as soon as it lands.
2. How to ask for a cancellation or a change
- Open your order confirmation email. Your order number is in it, and so is every line you typed for each café-name piece.
- Write to us. Email support@brewtee.shop from the address you used at checkout, if you can. A subject such as “Cancel order” or “Change order” followed by the order number helps us spot it.
- Say exactly what you want. “Cancel the whole order.” “Cancel the tote, send the rest.” “Staff Tee: L should be XL.” “Café name should read Larkspur Lane, not Larkspur Lnae.”
- Wait for our written answer. We reply within 24 hours on business days and confirm what has been done. Until you have that confirmation, treat the request as open, not settled.
One email with everything in it beats three short ones. If you are changing a name, type the full corrected text the way it should be printed and do not describe the fix in words. “Swap the a and the n” leaves room for a second mistake. “Larkspur Lane” does not.
If you prefer a ready-made subject line, the Submit a Ticket page has email links that fill it in for you.
3. What can be changed inside the window
| What you want to change | What to put in your email | Effect on the price |
|---|---|---|
| Spelling, capitals or punctuation of the café name | The full corrected name, up to 24 characters | None |
| The line under the name | Which option you want: Coffee Bar, Home Café, Espresso Bar, Coffee Corner, Kitchen Café or no second line | None |
| The Est. year | The four-digit year, or “remove the year” | None |
| An extra line, such as the role on the Barista Tee or the drinks on the House Menu Poster | The full corrected line | None |
| Apparel size | The piece, the size ordered and the size wanted | Changes if you cross into or out of 2XL–3XL or 4XL–5XL |
| Colour | The piece and the colour wanted, as named on the product page | We confirm by email |
| Mug size or poster size | The piece and the size wanted | We confirm by email if the sizes are priced differently |
| Delivery address | The complete new address, not only the corrected part | None. Shipping is free |
| Removing a piece | Which piece to take off the order | That piece is refunded to the original payment method |
Wanting to add a piece is the one request we handle differently. Place a second order for it. Shipping is free with no minimum, so a second order costs you nothing extra, and it keeps the first one moving.
4. Fixing a typo in the café name
This is the reason most people find this page, so it gets a section of its own.
The product page gives you two chances to catch a slip. The name check sets the name in its lettering under the fields as you type. The cart then lists every typed line again before checkout. And the tick box says what it means: “I checked the spelling. Print exactly as typed.”
Even so, fingers move faster than eyes. Say you ordered a Café Name Carry-Out Tote and two Café Name House Mugs, and the confirmation email shows “Larkspur Lnae Coffee Bar, Est. 2021” on all three. Here is the fix.
- Email us inside 24 hours of placing the order, with the order number.
- List each piece that carries the mistake. The same name typed on three product pages is three separate entries, and we correct the ones you name.
- Type the corrected text in full: “Larkspur Lane”, line under the name “Coffee Bar”, year “2021”.
- We confirm the correction in writing, and the pieces are printed with the corrected name.
The same route works for smaller regrets. A capital you wanted lowercase. An apostrophe that belongs in “Dana’s”. A year that should be 2019. An hours line on the hoodie that should end at noon, not eleven. Each of these is a change to typed text, and each is free inside the window.
What we will not guess
We print what was typed. We do not tidy spelling, add capitals or correct punctuation on our own, because an unusual spelling is often deliberate. A counter called “Kafé Nord” should stay that way. If something in your order looks unusual to you when you read it back, tell us. Do not assume someone will spot it for you.
5. Changing a size or a colour
Adult apparel comes in S, M, L, XL, 2XL, 3XL, 4XL and 5XL, in unisex cuts. If you ordered the Café Name Hoodie in L and then remembered you wanted it a size up for layering over a sweatshirt, email us inside the window with “Hoodie: L to XL”.
Price follows size at two points. Sizes 2XL–3XL cost $2 more than S–XL, and sizes 4XL–5XL cost $4 more. Moving from XL to 2XL adds $2. Moving from 3XL down to XL lowers the price by $2. When a change crosses one of those lines, we tell you the difference by email before the change is made, and nothing extra is charged without your say-so.
Unsure which of two sizes to pick? The Size Guide explains how to choose. Read it before you write, so that one email settles the question.
Aprons and totes are one size, so there is no size to change on those. Their colour can be changed in the same way as a garment’s.
6. Changing the delivery address
We deliver to the United States, Canada, Australia and New Zealand. Inside the 24-hour window, an address can be corrected or replaced with another address in any of those four countries.
- Send the whole address again: name, street, unit, city, state or region, postal code and country.
- If the order is a gift and should go to the recipient, not to you, say so plainly, so that we do not treat it as a typing slip.
- If the email address on the order is wrong, tell us the right one. Tracking details are emailed when the order ships, and they go to the address on the order.
More on addresses, and on what to do when a parcel is already travelling to the wrong one, is on the Shipping & Delivery page.
7. Cancelling an order
To cancel, email us within 24 hours of placing the order and say “cancel”, with the order number. You do not have to give a reason. Found the same gift idea already wrapped in the hall cupboard? Ordered twice by accident? Decided the counter needs a better name first? All fine.
You can cancel the whole order or only part of it. A gift giver who ordered a Staff Tee in L and a Barista Tee in 2XL for a father and son can cancel one tee and let the other go ahead.
When we confirm a cancellation, the amount you paid for the cancelled pieces is refunded to the original payment method. There is nothing to send back, because nothing was made or shipped. How soon the refund shows on your statement depends on your payment provider. The money side of every situation is set out in the Refund Policy.
8. If more than 24 hours have passed
Write to us anyway, and do it straight away. Tell us the order number and what you hoped to change. We will tell you honestly where the order stands and what can still be done.
We cannot promise a change or a cancellation after the window, because the piece may already be made. What we can promise is that you are not stuck with it. Every product, the café-name pieces included, can be returned within 60 days of delivery, and the return label is free. That route is described next.
9. If the order has shipped or already arrived
Once a parcel is on its way, the order can no longer be cancelled or edited. Let it arrive. Then use the return route.
- Email us within 60 days of delivery with the order number and the piece concerned.
- Tell us what you would like: your money back, store credit, or the piece made again with the right name, size or colour.
- We send a free return label. Change of mind is covered too.
- Send the piece back. A refund is paid within 7 days of receiving the return.
Take the tote from section 4. Suppose the typo was only noticed when the parcel was opened. We printed what was typed, as promised, and you can still send the tote back within 60 days and have it made again as “Larkspur Lane”. The full process is in the Returns & Exchanges Policy.
Store credit, if you choose it over a refund, never expires.
10. When we write to you about a name
Some names cannot be printed. We do not print the names of real businesses, coffee chains, brands, teams or characters, even as a joke between friends. A home café is yours to name, and the name has to be yours.
If an order carries a name like that, we will email you and ask you to choose another. Please keep an eye on your inbox, spam folder included, in the day or two after ordering a café-name piece. Our Intellectual Property Policy explains the rule itself.
11. How to never need this page
A minute at the product page saves an email later. This is the routine we would follow ourselves.
- Type the café name slowly, then read the name check out loud. Reading aloud catches swapped letters that the eye skips.
- Count the characters if the name is long. The field takes up to 24.
- Choose the line under the name on purpose. “No second line” is a real choice, not a blank.
- If you add an Est. year, check it is the year you mean and not this one by habit.
- Ordering one name across several pieces? Type it again on each product page and compare the lines in the cart. There is no automatic set, so each piece keeps its own spelling.
- In the cart, read every typed line, the size and the colour once more before you pay.
- Read the order confirmation email the moment it arrives, while the 24 hours are still young.
Set-design pieces, such as the Espresso Recipe Tee or the Moka Pot Morning Sweatshirt, have no fields at all. For those, the only things to check are size and colour.
12. Questions about an order you have just placed
Email support@brewtee.shop with your order number. We reply within 24 hours on business days, and email is the only way to reach us. If you want to know where a shipped order is, the Order Tracking page explains the emails and statuses. Everything else is listed in the Help Center.
Brew Tee, 236 West 11th Avenue, Columbus, OH 43210, US. Cancellations and changes are handled by email only, not by post.